![]() |
|
|
|
Chantrell Creek Bank Stabilization |
|
|
The work included installation of a large size concrete culvert to control erosion. This erosion-prone section was reconfigured with riprap lining, and complex habitat restoration. |
|
Value |
$215,000 |
|
Year |
2006 |
|
Owner |
City of Surrey |
|
Refer to |
Carrie Barron |
|
Arch./Eng. |
||
Refer to |
David Moschini (604-278-7847) |
|